SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2020080085,"Water Resources, Department of",California Department of Water Resources,DWR,California Aqueduct Reach 2B Erosion Repairs,NOE,8/6/2020,8/6/2020,"Embankment erosions in Reach 2B will be collapsed, filled, and sequentially compacted until all the available eroded material onsite has been used. If additional fill is needed, material will be transported from existing San Luis Field Division stockpiles. After the erosions are completely filled, they will be compacted. The embankments will be recontoured to the original slope. This work will be completed annually. State Water Project users will benefit.",https://ceqanet.opr.ca.gov/2020080085/2,California Aqueduct Reach 2B Erosion Repairs,Frank Ruiz,Dept. of Water Resources San Luis Field Division,N/A,,31770 Gonzago Rd.,,Gustine,CA,95322,2098275134,,,"Merced, Stanislaus",,,,,,,,,,,,,,,,,Categorical Exemption,15301 (Existing Facilities),"The project will repair erosions along both sides of the existing Aqueduct embankment in Reach 2B, as needed. Repairs are necessary to protect the integrity of the Aqueduct and will not increase the capacity or use of it. Categorical Exemption 15301 (Existing Facilities) applies.",,,,,,,,,,,,