SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2020080070,Los Angeles Department of Water and Power,,,"Mainline Replacement Project (at Chase St., Schoenborn St., and surrounding streets)",NOE,8/6/2020,8/6/2020,"The LADWP is committed in providing safe and reliable source of water to its customers. Under LADWP’s Water Infrastructure Plan, pipeline replacement projects promote long-term efficient operation and lower the risk of disruptions due to failures in the water distribution system. The proposed project would replace existing aging mainline pipes to provide a more reliable and safe water supply for the residents of this area. The proposed project replaces approximately 6,100 feet of aging mainline pipes of various sizes with ductile iron pipes in the locations listed above. Excavations on average measures, two feet wide and 54 inches in depth. Construction each day will be confined to a small area and moves along the project alignment for a total duration of approximately 6 months until completion. Excavated area will be covered with steel plates until the completion of each replaced pipe segment is backfilled and paved. Traffic control plans will be implemented per the WATCH Manual and Los Angeles Department of Transportation requirements. ",https://ceqanet.opr.ca.gov/2020080070/2,"Mainline Replacement Project (at Chase St., Schoenborn St., and surrounding streets)",Nancy Chung,Los Angeles Department of Water and Power,N/A,nancy.chung@ladwp.com,111 N. Hope Street,,"Los Angeles, ",CA,90012,2133670404,,Los Angeles,Los Angeles,,"Chase St., Community St., Schoenborn St., Sylvia Ave., Eccles St., and Beckford Ave",,,,,,,,,,,,,,,Categorical Exemption,"CEQA Guidelines Article 19 Categorical Exemption, Section 15302 (c) Class 2 Replacement/Reconstruction",Project is consistent with the above stated Categorical Exemption.,,,,,,,,,,,,