SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2020079025,Valley Center Municipal Water District,,,2020 Pipeline Replacement Program,NOD,10/20/2020,10/20/2020,"On October 19, 2020, Valley Center Municipal Water District (District) adopted the Final Initial Study Mitigated Negative Declaration (MND) (State Clearinghouse No. 2020079025) and Mitigation Monitoring and Reporting Program, and approved the Pipeline Replacement Program (Program). The Program would address infrastructure deficiencies that have contributed to an increase in the number of pipe breaks and joint failures in recent years. To address these and other deficiencies, the Program would systematically replace or upgrade the infrastructure, identifying and prioritizing the following projects that are to be completed within the next five years: • WSo15b - Old Castle Road Pipeline • MW015a - Oat Hill Discharge Pipeline North • SG022 - Lilac Pala Pump Station Discharge Pipeline • CV011 - Cole Grade Road Pipeline • CV018a - Alps Way Culvert Crossing Pipe Replacement • CV017a-Rock Hill Ranch Road Intertie • CV012a- Fruitvale Road Valves • PD0 16 - Hell Hole Creek Joint Repair • DW001 - Gordon Hill Road • CV0S0 - Lilac Road Pipeline Upsize All construction would occur within or adjacent to existing road corridors or within disturbed alignment. The disturbance areas would be limited to the construction phase and all disturbed areas would be restored to preconstruction conditions. Typical excavation depth would range from 3-5 feet below existing grade. All materials and equipment would be staged within the active construction area, within disturbed areas located adjacent to the corridor or at existing District properties located in proximity to the construction area.",https://ceqanet.opr.ca.gov/2020079025/4,2020 Pipeline Replacement Program,Wally Grabbe,Valley Center Municipal Water District,N/A,,29300 Valley Center Road,,Valley Center,CA,92082,7607354558,,,San Diego,,,,,,,,,,,,,,,,,,,,Valley Center Municipal Water District,Yes,10/19/2020,No,No,Yes,,Yes,Yes,No,No,"Valley Center Municipal Water District, 29300 Valley Center Road, Valley Center, California 92082."