SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2020070569,State Water Resources Control Board,,,Robert Young Family LP - UV Treatment Permit Amendment Project (Project),NOE,7/30/2020,7/30/2020,The Robert Young Family Limited Partnership installed a 20 gallon-per-minute VIQUA PRO20 ultraviolet (UV) unit for disinfection at the tasting room service connection. The UV unit is installed inline on 2.5-inch S40 PVC and mounted on the side of an existing winery structure. A five-micron pre-filter is installed in-line prior to the ultraviolet treatment.,https://ceqanet.opr.ca.gov/2020070569/2,Robert Young Family LP - UV Treatment Permit Amendment Project (Project),Janice Oakley,State Water Resources Control Board,N/A,,Sonoma District Office,"50 D Street, Suite 200",Santa Rosa,CA,95404,7075762145,,,Sonoma,,,,,,,,,,,,,,,,,Categorical Exemption,Class 1 Existing Facilities; Class 3 New Construction or Conversion of Small Structures,The Project was a negligible expansion of use of an existing facility and construction of the facility is complete. The Project involves no expansion of use beyond that existing at the time of the lead agency’s determination. This project includes construction of water supply and distribution lines of less than sixteen inches in diameter and no greater than one mile in length with a UV disinfection appurtenance.,,,,,,,,,,,,