SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2020060453,"San Diego, City of",City of San Diego,,Maple Canyon Restoration,NOD,4/1/2021,4/1/2021,"Capital Improvement Project to replace 16 storm drain systems throughout Bankers Hill that outfall into Maple Canyon and construct 1 new storm drain system within Maple Street between state street and the downstream end of Maple Canyon. Storm Drain sizes vary between 18 to 48-inches. Project work will also include storm drain inlets, cleanouts, energy dissipators, trench resurfacing, pavement resurfacing, curb ramps, sidewalk, curb and gutter, retaining wall, street repair, and revegetation. Replacement and extension shall result in approximately 4,166 linear feet of RCP installation. In addition, retaining walls, curb ramps, street resurfacing, salvage and replacement of guard rails and street lights where needed, traffic control, including pedestrian controls into the canyon and best management practices (BMPs), would be included as part of the project scope. The project site is located within a natural canyon near Maple Street in the Uptown Community Plan Area and City Council District 3. ",https://ceqanet.opr.ca.gov/2020060453/3,Maple Canyon Storm Drain,Jamie Kennedy,City of San Diego,N/A,JMKennedy@sandiego.gov,1222 1st Avenue,,San Diego,CA,92101,6194465445,32°43'58"N 117°9'58"W,San Diego,San Diego,San Diego,West Maple Street and Albatross Street,92103,5.86,Various ,"163, 5, 8, 94",San Diego Bay,San Diego International Airport,,,,,,,,,,,,City of San Diego,Yes,3/1/2021,No,No,Yes,,Yes,Yes,No,,City of San Diego