SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2020060446,Orange County Water District,,,OCWD Monitoring Well FM-35,NOE,6/22/2020,6/22/2020,"The proposed Project involves the construction of a new monitoring well cluster, designated FM-35, within the paved parking lot of an industrial property in the City of Fullerton. OCWD installed extraction well EW-1 in 2008 as part of a network of six extraction wells to capture and contain groundwater containing volatile organic compounds (VOCs) in the northern area of the Orange County Groundwater Basin, referred to as North Basin. EW-1 is the easternmost of the six extraction wells. After the six extraction wells, including EW-1, were installed, that project was put on hold for reevaluation and construction of the wellheads was not completed. However, due to an imminent threat to the Principal Aquifer and down-gradient City of Fullerton production wells, construction of EW-1 was completed and the well started operating in September 2017. The RWQCB and SWRCB requested OCWD install a monitoring well cluster directly down-gradient of EW1 and upgradient of Fullerton production well F-10 in order to (1) measure depth-discrete water levels down-gradient of EW-1 to assist with the preparation of groundwater contours that depict the approximate capture zone of EW-1; (2) evaluate depth-discrete VOC concentrations down-gradient of the EW-1 capture zone; and (3) Provide data to support potential adjustments to EW-1’s pumping rates under varying groundwater levels and gradients.",https://ceqanet.opr.ca.gov/2020060446/2,OCWD Monitoring Well FM-35,Shawn Nevill,Orange County Water District,N/A,,18700 Ward Street,,Fountain Valley,CA,92708,7144695740,,Fullerton,Orange,,2100 E. Valencia Drive,,,,,,,,,,,,,,,Categorical Exemption,"Class 3, Section 15303",The proposed project involves limited construction of a monitoring well cluster within a paved parking lot on an industrial (warehouse) site devoid of any sensitive habitat and falls within Class 3 descriptions for the new construction of small structures.,,,,,,,,,,,,