SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2020060424,Sutter Butte Flood Control Agency,,SBFCA,Yuba City Boat Ram[ Sediment Removal Project,NOD,2/12/2021,2/12/2021,"Sediment buildup in portions of the Feather River, exacerbated by the Oroville Dam Spillway incident of 2017, has created dangerous conditions for recreational users, made some boat launch facilities nearly unusable, and has hampered public safety as it has affected emergency vessel launching capabilities. The Proposed Project will improve access to the Feather River and Yuba River by removing sediment at and near the Yuba City Boat Ramp facility. The Project has received funding from the California Natural Resource Agency through Proposition 68 to remove sediment for safety purposes, to restore recreation access to the Feather River, and to restore fish passage at the confluence of the Feather and Yuba Rivers. The Proposed Project would include the following: maintenance dredging of the boat ramp/boat area and the confluence of the Feather River and the Yuba River; dewatering the dredged material in the existing northernmost wastewater ponds at the former Marysville Wastewater Treatment Plant (WWTP) proposed by the City of Marysville for decommissioning; and disposal of the dredged material. Phase 1 of the Project would involve removal of the originally planned 65,600 cy, and Phase 2 of the Project would involve the additional 250,000 cy if additional funding becomes available, for a total of 315,600 cy. The Project would occur between 2021 and 2023, starting in June 2021.",https://ceqanet.opr.ca.gov/2020060424/4,Yuba City Boat Ramp Sediment Removal Project,Michael Bessette,Sutter Butte Flood Control Agency,N/A,m.bessette@sutterbutteflood.org,P.O. Box M,,Yuba City,CA,95992,5307559859,,,"Butte, Sutter","Sutter, Yuba",End of Second Street,95991,14,52-570-006,"99, 70, 20","Feather River, Yuba River","Sutter County, Yuba County",,,,,,,,,,,,Sutter Butte Flood Control Agency,Yes,2/10/2021,No,Yes,No,,Yes,Yes,Yes,Yes,"1445 Butte House Road, Suite B, Yuba City, CA 95993"