SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2020060140,"Caltrans, District 10 - Stockton","California Department of Transportation, District 10",DOT,Electrical Traffic Management System Cabinet Repair,NOE,6/8/2020,6/8/2020,"The project scope includes bringing existing conduit at various off/on ramp traffic signal cabinets up to current standards; replacing approximately 50 pull-boxes with theft deterrent pull-boxes along the shoulder of the Route 26/99 Separation (Bridge No. 29-0142); and approximately 30 pull-boxes along the shoulder at Route 88/99 Separation (Bridge No. 29-0143). The purpose of the project is to bring existing TMS elements up to current standards. The project is needed to minimize theft, prevent further deterioration, and extend the service life of the existing TMS elements.",https://ceqanet.opr.ca.gov/2020060140/2,Electrical Traffic Management System Cabinet Repair,Karimeh Juma,"Caltrans, District 10",N/A,,1976 E. Dr. Martin Luther King Jr. Blvd.,,Stockton,CA,95212,2099426045,,,San Joaquin,,,,,,State Route 26/99; 88/99,,,,,,,,,,,Categorical Exemption,15301 ,"Project will not affect any sensitive resources or their habitat, any cultural resources, or any other environmentally sensitive resources.",,,,,,,,,,,,