SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2020059009,"Santa Clara, City of",City of Santa Clara,,South Loop Reconfigure Project,MND,5/8/2020,,"Silicon Valley Power (SVP) is proposing to construct approximately 3.5 miles of new 60 kilovolt (kV) overhead transmission line within the northeastern area of the City of Santa Clara. SVP’s primary objective of the SVP South Loop Reconfigure Project (proposed project) is to shift the electrical load demand that is currently being seen on the South Loop Circuit to the East Loop Circuit. The new power line would begin at the Kifer Substation, located near the corner of Central Expressway and Lafayette Streets, and would continue to the De La Cruz Substation, which is located on Mathew Street. The transmission line would also be routed to several other existing substations located along or near the transmission line corridor, including Fiberglass, Walsh, and Mathew Substations. The majority of the new 60 kV transmission line would be constructed along the following city streets: Lafayette Street, Mathew Street, Martin Avenue and De La Cruz Boulevard. Approximately 3 miles of the proposed route would be located in areas where existing power lines do not currently exist. The remaining segments of the Proposed Project would be along routes that have existing distribution power lines and/or telecommunication lines. Construction is estimated to take approximately 6 months and be completed by the end of 2020.",https://ceqanet.opr.ca.gov/2020059009/2,South Loop Reconfigure Project,Jeevan Valath,"City of Santa Clara, Silicon Valley Power",N/A,,881 Martin Avenue,,Santa Clara,CA,95050,4086156609,37°21'59"N 121°57'1"W,Santa Clara,Santa Clara,,,95050,3.5 miles,Various,"US 101, SR-237","Guadalupe River, San Tomas Aquino Creek, Saratoga Creek, and Calabazas Creek",San Jose,No,5/8/2020,6/8/2020,Power,Use Permit,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire",,,,,,,,,,,,,,,,,