SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2020050535,State Water Resources Control Board,,,Upper Tank Replacement Project,NOD,6/8/2021,6/8/2021,"The State Water Resources Control Board (State Water Board) is the Lead Agency for the Project. The State Water Board’s Drinking Water State Revolving Fund (SRF) Program is financing the Project. The Project includes replacement of the existing 35,000-gallon redwood tank and three 10,000-gallon temporary plastic tanks with a single 122,000-gallon welded steel tank. The new storage tank would be approximately 32 feet in diameter and 26.5 feet tall and would be welded in place on a perimeter-reinforced concrete-ring foundation supported by subgrade soil. Two mature pine trees would be removed for Project construction. All construction laydown and storage would occur on the site. The new tank would be accessed by a new paved driveway, and a paved apron would surround the new tank.",https://ceqanet.opr.ca.gov/2020050535/3,Clearwater Mutual Water Company Upper Tank Replacement Project,Gabriel Edwards,State Water Resources Control Board,N/A,gabriel.edwards@waterboards.ca.gov,1001 I Street,16th Floor,Sacramento,CA,95814,9164495990,,,Lake,Lake,Osceola Ave,95451,,046-024-01,,,,,,,,,,,,,,,State Water Resources Control Board,Yes,6/7/2021,No,No,Yes,,Yes,Yes,No,No,"State Water Board, Division of Financial Assistance at 1001 I Street, 16th Floor, Sacramento, CA 95814."