SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2020050308,"Stockton, Port of",Port of Stockton,,Central Valley Ag Group Bulk Whole Cottonseed Transload Facility at the Port of Stockton,MND,5/15/2020,,"CVAG is proposing to establish a new transloading facility at the Port to receive whole cottonseed by rail and transport it out of the Port by truck. As part of the proposed project, CVAG would construct a small concrete apron pad on an existing Port concrete pad lot; fill and level holes in the existing concrete pad lot; install a portable modular-type office, truck scale, portable toilet, diesel fuel tank, fuel storage compartment, and auxiliary generator at the project site; and designate part of the project site as a parking lot. The proposed project would not require new permanent buildings or infrastructure improvements and would not include berth or in-water work. Electricity would be provided to the project site through an existing power pole at the southwest corner of the project site.",https://ceqanet.opr.ca.gov/2020050308/2,Central Valley Ag Group Bulk Whole Cottonseed Transload Facility at the Port of Stockton Final Initial Study/Mitigated Negative Declaration,Jason Cashman,Port of Stockton,N/A,jcashman@stocktonport.com,2201 West Washington Street,,Stockton,CA,95203,2099460246,37°56'25.99"N 121°19'40.46"W,Stockton,San Joaquin,,Port Road 23 and Port Road K,95203,2.5,14503012,SR-4,San Joaquin River,None,Yes,5/15/2020,6/15/2020,Industrial,,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Drainage/Absorption, Economics/Jobs, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Vegetation, Wetland/Riparian, Wildfire, Wildlife",,,,,,,,,,,,,,,,,