SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2020050071,"Forestry and Fire Protection, Department of",California Department of Forestry and Fire Protection,CAL FIRE,Toro Fire Center,NOE,5/4/2020,5/4/2020,"The project will consist of removing debris from the entire site and digging trenches for new utilities in various locations within the footprint of the project. Approximately one third of the project site is covered in deteriorated asphalt with an existing building structure and concrete apron. Activities associated with the project will be ground disturbing trenching to depths between 18"" to 36"" and no greater than 36"" wide. A utility trench, approximately 410 meters long, will border the southern half of the project area. A second utility trench for electricity will extend approximately 76 meters on the northwest side of the project from Sutter Ave to the main project line along the access driveway. A third trench for water and fiber optic cable will extend approximately 115 meters on the northeast side of the project across Sutter Ave to the main project line. A fourth trench will extend from the existing building structure approximately 130 meters to a portable unit located in the southeast comer of the project. Project trenching will result in approximately 800 cubic yards of soil disturbance. Less than one acre of soil will be disturbed and areas will be backfilled to original grade, which will prevent any change in drainage pattern. See NOE for full details.",https://ceqanet.opr.ca.gov/2020050071/2,Toro Fire Center,Brandon Sanderson,CAL FIRE San Luis Obispo Unit,N/A,,635 N. Santa Rosa St.,,San Luis Obispo,CA,93405,8055282160 ext. 201,,San Luis Obispo,San Luis Obispo,,1575 Sutter Avenue,93405,,,,,,,,,,,,,,Categorical Exemption,"Class 1, 3, and 4; § 15301, 15303, 15304","This project fits under portions of three classes of Categorical Exemptions listed in the CEQA Guidelines - 14CCR §15300: Class 1 (Existing Facilities), Class 3 (New Construction or Conversion of Small Structure), and Class 4 (Minor Alterations to Land). Most of the project activities would occur within previously disturbed areas. The areas where new ground disturbing activities might occur are limited and are minor in scope. These areas were carefully inspected for environmental concerns and will be monitored for previously unidentified resources. The activities will not result in the taking of endangered, rare, or threatened plant or animal species, or sedimentation to surface waters.",,,,,,,,,,,,