SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2020049009,Sacramento County,,,Capitola Pump Station Rehabilitation Project,NEG,4/2/2020,,"The project proposes to replace the existing dry pit pump station with a wet pit, submersible pump station. During storm events, the drainage channel/tributary flows over the pavement, depositing sediment and debris throughout the area. To alleviate this problem, the pump station will be reconfigured to include a new valve vault, manhole, and wet well. The maximum vertical depth of excavation will be 15 feet; excavation will be confined to the pump station limits. Other components of the project include widening the existing access road, constructing curbs and guardrails, constructing a retaining wall around the eastern portion of the pad, extending the pump station pad approximately 500 square feet, and replacing the existing 24-inch culvert, which diverts the existing drainage beneath the project site, with a 36-inch culvert. Concrete headwalls will be constructed within the drainage feature at the northern and southern ends of the pump station.",https://ceqanet.opr.ca.gov/2020049009/2,Capitola Pump Station Rehabilitation Project,Josh Greetan,Sacramento County,N/A,,827 7th Street Suite 225,,Sacramento,CA,95814,9168766452,38°38'24"N 121°15'35"W,,Sacramento,,,95628,0.37,,Us Route 50,American River,,No,4/2/2020,5/1/2020,Other,,"Air Quality, Cultural Resources, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Hydrology/Water Quality, Noise, Public Services, Sewer Capacity, Tribal Cultural Resources, Vegetation, Wildlife",,,,,,,,,,,,,,,,,