SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2020040378,"Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka","California Department of Fish and Wildlife, Northern and Eureka Region 1",CDFW,Crane Mills Thomes Creek Water Diversion and Griffin Creek Culvert Replacement Project (Lake or Streambed Alteration Agreement No. 1600-2019-0214-R1),NOE,4/29/2020,4/29/2020,"The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement number 1600-2019-0214-R1, pursuant to Section 1602 of the Fish and Game Code to Crane Mills, as represented by Ross Maitia. Thomes Creek Water Diversion Project: The Thomes Creek water diversion project is limited to the installation, maintenance, and repair of a gravel berm and diversion ditch used to divert water from Thomes Creek; the repair and maintenance of a fish screen within the gravel diversion channel; and the diversion of water pursuant to a legal water right. Griffin Creek Culvert Replacement Project: The Griffin Creek culvert replacement project is limited to removing the existing fill that is over the top of a partially collapsed 48-inch culvert, removing the old culvert, and installing 100 feet of 108-inch culvert pipe. A Cat 330 Excavator, Cat D8H, and a dump truck will be used to remove the old culvert and install the new culvert. It is estimated that about 2,400 cubic yards of fill material will need to be removed to access the old pipe. The same excavated fill material will be used to bring the road back up to grade. The approaches to the crossing will be lowered as much as possible (maybe 3-4 feet) and a critical dip added. The fill will be compacted in 1-foot lifts. The M2 Road is a public road, a temporary culvert crossing about 150 feet upstream from the permanent culvert crossing may be installed to allow for traffic. A 24-inch culvert will be used along with the native gravel from the alluvial deposit above the main crossing. It will be removed as soon as the main crossing is complete.",https://ceqanet.opr.ca.gov/2020040378/2,Crane Mills Thomes Creek Water Diversion and Griffin Creek Culvert Replacement Project (Lake or Streambed Alteration Agreement No. 1600-2019-0214-R1),Adam McKannay,Department of Fish and Wildlife,N/A,,601 Locust Street,,Redding,CA,96001,5302252124,39°53'2.5"N 122°32'42.9"W,,Tehama,,,,,85-030-037,,Thomes Creek,,,,,,,,,,Categorical Exemption,"Class 2, Section 15302 (c); Class 1, Section 15301",The culvert replacement project involves replacement of an existing structure with a new structure in the same footprint. The water diversions involves the operation of an existing permitted water diversion with no expansion in use.,,,,,,,,,,,,