SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2020040314,Ross Valley Sanitary District,Ross Valley Sanitary District,,Laurel Grove Avenue Sewer Rehabilitation Project,MND,4/24/2020,,"The Laurel Grove Avenue Sewer Rehabilitation Project is located along Laurel Grove Avenue between Sir Francis Drake Boulevard and Makin Grade with Project elements extending on Quisisana Drive and Hanken Drive. The Project entails the construction and rehabilitation, within the existing alignment, of approximately 4,370 linear ft of sanitary sewer mains and related appurtenances within the town of Kentfield. The Project includes: • Rehabilitation or replacement, by pipe bursting, of approximately 3,510 ft of sewers (with high-density polyethylene [HDPE] pipe), and upsizing the diameter of the trunk line under Laurel Grove Avenue between Sir Francis Drake Boulevard and Makin Grade. • Replacement, by open cut, of approximately 290 linear ft of 6-in. clay and cast-iron sewer on Quisisana Drive with 10-in. plastic (polyvinyl chloride [PVC] pipe) pipe between Laurel Grove Avenue including a storm drain pipe drainage shield and the first manhole, which will also be replaced to prevent ground water infiltration. • Replacement, by open cut, of approximately 185 linear ft of the clay sewer on Hanken Drive with an 8-in. plastic (PVC pipe) and replacement of 310 linear ft of clay sewer by pipe burst on Laurel Grove Avenue and on Hanken Drive to the first manhole (with high-density polyethylene [HDPE] pipe). • Upsizing the lower section of the sewer from 10 in. to 16 in. of approximately 110 linear feet with [PVC] pipe under Sir Francis Drake Boulevard, installed by open cut methods including a pipe casing under the storm drain. The primary objective of this Project is to relieve hydraulic and structural deficiencies and reduce groundwater infiltration with aging RVSD infrastructure. The Project is anticipated to be completed by late October 2020. Work hours will generally be from 8 a.m. to 5 p.m. along the Laurel Grove Avenue, Quisisana Drive and Hanken Drive alignments. Work hours will generally be from 8 p.m. to 5 a.m. at the Sir Francis Drake Boulevard alignment. ",https://ceqanet.opr.ca.gov/2020040314/2,Laurel Grove Avenue Sewer Rehabilitation Project,Steve Moore,Ross Valley Sanitary District,N/A,smoore@rvsd.org,2960 Kerner Boulevard,,San Rafael,CA,94901,4152593946,,,Marin,,Laurel Grove Avenue between Sir Francis Drake Boulevard and Makin Grade,94904,0.50 to 0.75,,"101, 580",,,Yes,4/24/2020,5/26/2020,,,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Geology/Soils, Greenhouse Gas Emissions, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire",,,,,,,,,,,,,,,,,