SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2020040291,Los Angeles Department of Water and Power,,,Rosamond Switching Station Project,MND,4/21/2020,,"Under the proposed project, LADWP would construct a new 230 kilovolt (kV) switching station, Battery Energy Storage System (BESS), and Flexible Alternating Current Transmission System (FACTS) Device. The proposed switching station (approximately 1,200 feet long and 800 feet wide) would include a control house with space necessary for operational control. The BESS (approximately 850 feet by 850 feet) is used to store excess energy during peak renewable energy production and to provide a fast energy delivery response to power shortages, brownouts, and enhance grid stability and reliability. The FACTS Device consists of a switchyard (approximately 189 feet long, 180 feet wide, and 58 feet in height) and a control house (approximately 35 feet long, 86 feet wide, and 13 feet in height). The FACTS Device would help regulate and control voltage to help improve power reliability and to meet power demand. Other project activities include installation of access roads throughout the facility, installation of a perimeter fence, and installation of new steel lattice transmission towers to direct the existing circuits in and out of the proposed switching station. The overall purpose of the project is to help meet broader goals towards increasing the use of sustainable renewable energy sources while decreasing the production of greenhouse gas and air pollutant emissions.",https://ceqanet.opr.ca.gov/2020040291/2,Rosamond Switching Station Project,Aiden Leong,Los Angeles Department of Water and Power,N/A,aiden.leong@ladwp.com,"111 N Hope St, Room 1044",,Los Angeles,CA,90012,2133670706,34°51'36.82"N 118°18'47.2"W,,Kern,,"Rosamond Blvd, 100th St W",93560,120,Multiple - See MND,,,,Yes,4/23/2020,5/25/2020,Power,,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Geology/Soils, Greenhouse Gas Emissions, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Transportation, Wildfire",,,,,,,,,,,,,,,,,