SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2020040204,State Water Resources Control Board,,,Operation of Solano Verde Mutual Water Company (Company) - Reservoir #1 Replacement Project (Project),NOE,4/17/2020,4/17/2020,"The Company has replaced an existing 425,000-gallon reservoir with a new 600,000-gallon steel bolted drinking water reservoir to provide new additional required fire suppression storage during potential power outages. The Project is within the existing footprint of the existing reservoir facility, and is already constructed.",https://ceqanet.opr.ca.gov/2020040204/2,Operation of Solano Verde Mutual Water Company (Company) - Reservoir #1 Replacement Project (Project),Robert Eranio,State Water Resources Control Board,N/A,,"1180 Eugenia Place, Suite 200",,Carpinteria,CA,93013,8057320495,,,,,6909 Solano Verde Drive,,,,,,,,,,,,,,,Categorical Exemption,15301,The Project is an existing facility and construction of the facility is complete. The project involves no expansion of use beyond that existing at the time of the lead agency's determination.,,,,,,,,,,,,