SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2020040122,Imperial County,,,CED Westside BES Project ,EIR,4/6/2021,,"The Project would be comprised of lithium-ion and/or flow battery energy storage system facilities, a behind-the-meter solar energy facility, a new on-site 230 kilovolt (kV) loop-in switching station, a 34.5 kV to 230 kV Project substation, underground electrical cables, and permanent vehicular access to and from the Project Site over a proposed clear-span bridge spanning IID’s Westside Main Canal. The proposed loop-in switching station would connect the Project to the existing IID Campo Verde-Imperial Valley 230 kV radial gen-tie line, which connects to the Imperial Valley (IV) Substation and the California Independent System Operator (CAISO), approximately one-third mile south of the Project Site. CED has submitted the necessary Interconnection Request Applications to the California Independent System Operator (CAISO) and Imperial Irrigation District (IID). The Project compliments both the existing operational renewable energy facilities, and those planned for future development in the County, and supports the broader Southern California’s bulk electric transmission system by serving as a firm, dispatchable resource.",https://ceqanet.opr.ca.gov/2020040122/3,CED Westside BES Project ,Kevin Kohan,Stantec Consulting Services Inc.,N/A,kevin.kohan@stantec.com,290 S. Conejo Ridge Avenue,,Thousand Oaks,CA,91362,8053382163,32°43'44.7"N 115°42'58.04"W,Imperial,Imperial,,"Westside main canal, Liebert Road, and Mandrapa Road",92243,163,"051-350-010, 051-350-011, 051-350-009, 051-350-019, 051-350-018",,,,Yes,4/7/2021,5/27/2021,Power,"General Plan Amendment, Rezone, Site Plan, Use Permit","Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cumulative Effects, Drainage/Absorption, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hydrology/Water Quality, Land Use/Planning, Septic System, Tribal Cultural Resources",,,,,,,,,,,,,,,,,