SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2020040105,Fullerton Joint Union High School District,,,Fullerton Plummer Auditorium Seismic and Access Upgrade Project,NOD,11/12/2020,11/12/2020,"The Plummer Auditorium located at the corner of E. Chapman Avenue and Lemon Street on the Fullerton High School campus (201 E. Chapman Avenue) is a historic resource (listed on the National Register of Historic Places). The approach to design, alterations, and additions, has been completed with the objective of retaining historic character and maintaining the character-defining spaces and features of the existing building and its setting. Therefore, the significance of the building has been recognized and acknowledged. The Plummer Auditorium is a single-story concrete shear-wall building with a Mezzanine, full basement, and clock tower. The proposed project would rehabilitate the existing building under the provisions of Title 24 Part 1 Section 4-306 and Secretary of the Interior’s Rehabilitation Standards, which includes the following notable items: • Strengthen the concrete columns and pilasters with steel plate and/or fiber reinforced polymer wrap. • Strengthen the clock tower exterior walls with fiber reinforced polymer wrap. • Construct new exterior buttresses to the west of the colonnade walkway. This includes new concrete caisson foundations. • Infill the east stage opening with concrete shear wall. • Reinforce the main roof concrete diaphragm perimeter with bolted steel plate. • Construct a new concrete shear wall entry lobby to the east of the existing structure. • Provide Accessibility to toilet rooms at basement. • Provide Accessible toilet facilities at first level. • Provide Accessible seating at auditorium level.",https://ceqanet.opr.ca.gov/2020040105/4,Fullerton Plummer Auditorium Seismic and Access Upgrade Project,Alex Kang,Fullerton Joint Union High School District,N/A,akang@fjuhsd.org,1015 W. Bastanchury Road,,Fullerton,CA,92833,7148702823,33°52'27.36"N 117°55'12.88"W,Fullerton,Orange,,E. Chapman Avenue and Lemon Street,92832,0.5,029-050-02,SR 91,"Brea Creek, Fullerton Creek",N/A,,,,,,,,,,,,Fullerton Joint Union High School District,Yes,11/10/2020,No,Yes,No,,Yes,Yes,No,Yes,"1051 W. Bastanchury Road, Fullerton, CA 92832"