SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2020040064,"Caltrans, District 7 - Los Angeles","California Department of Transportation, District 7",DOT,Interstate 405 at San Gabriel River Bridge Scour Mitigation Project,NOD,7/2/2020,7/7/2020,"The California Department of Transportation (Caltrans) proposes a bridge scour maintenance project at the Interstate 405 (I-405) / Interstate 605 (I-605) interchange - a complex of three (3) bridges that traverse the San Gabriel River at the Los Angeles County/Orange County line. Two of the three bridges exist within the jurisdiction of Caltrans District 7 - Los Angeles (Bridge No. 53-1185 and Bridge No. 53-1737H from post mile 0.2/0.3), and the third bridge exists within the jurisdiction of Caltrans District 12 - Orange County (Bridge No. 53-413F at post mile 24.11). The scope of work for all three bridges includes 1) retrofit of bridge substructure foundation by constructing pier footing extensions at Pier 3 and Pier 4 at each bridge, 2) reinforcement of new footing extensions through placement of new Cast-In-Drilled-Hole (CIDH) piles, and 3) armoring of substructure retrofit through placement of rip-rap/rock protection around each pier.",https://ceqanet.opr.ca.gov/2020040064/3,Environmental Addendum/Reevaluation/Revalidation,"Eduardo Aguilar, Branch Chief/Senior Environmental Planner",Caltrans District 7 - Los Angeles,N/A,eduardo.aguilar@dot.ca.gov,100 S. Main Street,MS-16A,Los Angeles,CA,90012,2138978492,33°47'11.8"N 118°5'38.1"W,"Long Beach, Los Alamitos, Seal Beach","Los Angeles, Orange",,Interstate 405/Interstate 605 Interchange,90815,35,7238-030-906,"405, 605, 22",San Gabriel River,,,,,,,,,,,,,Caltrans District 7 - Los Angeles,Yes,6/17/2020,No,No,Yes,,No,Yes,No,Yes,https://tinyurl.com/I405-SGR-Final