SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2020040023,Yucaipa Valley Water District,,,Interstate 10 Dunlap Sewer Crossing,NOE,4/2/2020,4/2/2020,"This project includes the installation of 1,350 Linear Feet (LF) of sewer main line. This 1,350 LF segment of sewer main line will provide additional opportunities for needed improvements for existing customers to receive sewer service from the District. The sewer main line will be constructed of 15"" Vitrified Clay Pipe (VCP) with the exception of 616 LF of High Density Poly-Ethylene (HOPE} that passes through the pipe jack under Interstate 10.",https://ceqanet.opr.ca.gov/2020040023/2,Interstate 1 O Dunlap Sewer Crossing,Matt Porras,Yucaipa Valley Water District,N/A,,12770 Second Street,,Yucaipa,CA,92399,9097903300,34°1'4.34"N 117°5'48.82"W,Yucaipa,San Bernardino,,,,,,,,,,,,,,,,,Categorical Exemption,15303 (d.) New Construction or Conversion of Small Structures,"An aquatic resources delineation was completed for the project. The project is located on mostly disturbed land with little to no vegetation, much of which has been graded. A portion of the project runs under Interstate 10 and near commercial properties. Oak Glen Creek is not anticipated as part of the project thus not requiring resource agencies permitting. In addition the sewer length is only 1,350 linear feet.",,,,,,,,,,,,