SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2020029097,"Signal Hill, City of",City of Signal Hill,,2020 Walnut Industrial Park,MND,2/28/2020,,"Located on the west and east sides of Walnut Avenue, south of Hill Street and north of Jenni Rivera Park, 20th Street, and Alamitos Avenue, the project site consists of 8.37 acres that was formerly developed as an oil refinery. All refinery improvements were removed and the southerly sloping site consists mostly of bare soil. Development of nine 1-story and 1-story-with-mezzanine concrete tilt-up buildings, for occupancy by a variety of light industrial businesses, along with a variety of site improvements, such as surface- level parking, landscaping, and miscellaneous underground water, sewer, storm drainage, electricity, and communication lines. The project would dedicate private land for expanded public street right-of-way at the southern terminus of Gundry Avenue, along Walnut Avenue, and 20th Street. Additionally, 21st Street between Walnut Avenue and Gundry Avenue would be vacated and incorporated into the project site plan. The project also includes a soil vapor extraction system to capture and remove soil vapor gas resulting from contamination by the former oil refinery that previously operated on the project site. The project is estimated to require 18-19 months for construction and it is presumed that all buildings will be fully occupied and operational by late 2021 .",https://ceqanet.opr.ca.gov/2020029097/2,2020 Walnut Industrial Park 2nd RMND,Colleen Doan,City of Signal Hill,N/A,,2175 Cherry Avenue,,Signal Hill,CA,90755,5629897344,33°47'43"N 118°10'20"W,Signal Hill,Los Angeles,,Walnut Avenue and 21st Street,90755,8.37,See NOC for APNs,"19, 1",Los Angeles River,Long Beach Airport,Yes,2/28/2020,3/30/2020,Industrial,"General Plan Amendment, Land Division (Subdivision, etc.), Rezone, Site Plan","Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Vegetation, Wetland/Riparian",,,,,,,,,,,,,,,,,