SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2020029034,Cajon Valley Union School District,,CVUSD,Montgomery Middle School Field Lighting Project,MND,2/11/2020,,"The District intends to install field lighting at its athletic fields at Montgomery Middle School. No field lighting is currently installed. The recreational fields are located directly east of the school building, west of the tennis courts, and north of the school parking lot and Granite Hills Drive. Up to 32 light emitting diode (LED) fixtures would be installed atop six (6) new steel poles (70 feet high), erected on the east and west side of the recreation fields. Figure 1, Site Plan, indicates the proposed locations of field light installation. Construction activities would include trenching to extend electrical to light pole locations, excavation at pole locations, installation of pre-cast concrete bases with integrated grounding at pole locations, assembly of luminaries and installation of luminaries on poles, and installation of poles on pre-cast concrete bases with the use of a boom lift. Construction of the project would take approximately two months to complete (two months is a conservative estimate, and activities would likely require a shorter time-frame to complete). Construction activities are anticipated to occur Monday through Friday, 7:00 a.m. to 3:30 p.m. Equipment to be used during construction would include a trencher, small excavator, small truck, drill rig, boom lift, and small crane. Hand tools would also be used during assembly of luminaries and installation of luminaries on poles. See NOC for full details.",https://ceqanet.opr.ca.gov/2020029034/2,Montgomery Middle School Field Lighting Project,Sharon Dobbins,Cajon Valley Union School District,N/A,,750 E Main Street,,El Cajon,CA,92020,6195883016,,El Cajon,San Diego,,"1570 Melody Lane, El Cajon; Granite Hills Drive and Fourth Street",92019,3.9,511-210-19-00,I-8,Forester Creek,,No,2/11/2020,3/11/2020,Recreational,Site Plan,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire",,,,,,,,,,,,,,,,,