SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2020019065,Los Angeles County,,,Western Trunk Line Project,MND,1/23/2020,,"The Western Trunk Line Project would involve the replacement of a 23,300-foot portion of the Harbor Trunk Line within Western Avenue, from 59th Place to 121st Street. The proposed project would be located in the City of Los Angeles between 59th Place and 108th Street, and in unincorporated Los Angeles County between 108th Street and 121 st Street. In addition to the proposed trunk line replacement, the proposed project would also replace approximately 4,495 feet of 6-inch and 8-inch diameter water distribution mainline along Western Avenue. The water distribution mainline improvements would include the following: the replacement of 3,750 feet of existing 6-inch mainline with 12-inch line from 77th Street to Manchester Avenue; the replacement of 625 feet of existing 8-inch mainline with 12-inch line from 106th Street to 108th Street; and the installation of approximately 120 feet of 8-inch line to reconnect the existing 8-inch mainline on Western Avenue to the existing 8-inch line on Manchester Avenue. In order to maintain water pressures at specific intersections, the proposed project would also include minor improvements and the replacement of an existing regulator station, located at the intersection of Manchester Avenue and Western Avenue.",https://ceqanet.opr.ca.gov/2020019065/2,Western Trunk Line Project,Christopher Lopez,Los Angeles Department of Water and Power,N/A,,"111 N. Hope Street, Room 1044",,Los Angeles,CA,90012,2133673509,33°59'12.24"N 118°18'32.24"W,Los Angeles,Los Angeles,,"W. Gage Street, W. Florence Street, W. Manchester Avenue, W. Century Blvd, Imperial Hwy and West",90047,"23,300 linear ft",,Interstate 110 and 105,,,Yes,1/23/2020,2/21/2020,Water Facilities,,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire",,,,,,,,,,,,,,,,,