SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2020010357,Marin Municipal Water District,,,Ross Reservoir Landslide Repair Project,NOE,1/23/2020,1/23/2020,"The proposed Ross Reservoir Landslide Repair Project involves stabilization of an active slide downslope from the existing Ross Reservoir. The landslide stabilization requires removal of trees and vegetation in the landslide repair area, construction of two tie-ins to the existing 24-inch outlet pipe installation of benches cut into the bedrock, installation of a drainage system within the slide stabilization area, construction of a slope buttress, revegetation of the slide area, relocation of a water transmission line, and construction of a new access road and access improvements. The full project description and avoidance measures are included as Appendix A of this Notice of Exemption. Additional information on the project is provided in Appendix B of this Notice of Exemption. As an initial step in furtherance of the Ross Reservoir Landslide Repair Project, the District has approved the removal of trees and vegetation obstructing the landslide repair area.",https://ceqanet.opr.ca.gov/2020010357/2,Ross Reservoir Landslide Repair Project,Alex Anaya,Marin Municipal Water District,N/A,,220 Nellen Avenue,,Corte Madera,CA,94925,4159451588,,,Marin,,,,,197-120-04,,,,,,,,,,,,Emergency Project,Sec. 21080(b)(4); 15269(b)(c),"The project qualifies for exemption pursuant to Section 21080(b){4) and 15269(b)(c) because the project involves an emergency repair to publicly owned services facilities necessary to maintain service essential to public health and safety, and represents specific actions needed to prevent an emergency. Further discussion of why this project is exempt from CEQA is provided in Appendix C of this Notice of Exemption.",,,,,,,,,,,,