SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2020010281,"South San Francisco, City of",City of South San Francisco,,751 Gateway Boulevard Project,EIR,9/22/2020,,"The proposed project involves construction of a 148-foot-tall, seven-story building with approximately 208,800 square feet of space (60 percent R&D uses and 40 percent office uses). The new building would be constructed on the existing surface parking lot. The existing office building at 701 Gateway Boulevard would remain. The ground floor of the proposed building would include a “through lobby” with access from the north and south; the lobby would include an amenity space for tenants. An entry plaza and landscaped visitor lot would be constructed north of the proposed building. An entrance and screened service yard would be constructed south of the proposed building. The proposed project would improve pedestrian connections between the nearby Gateway Campus buildings at 701, 901, 951, and 801 Gateway Boulevard by creating a pedestrian hub central to the campus. The proposed project would also include surface parking lots with a total of 418 parking spaces on-site (including approximately 42 parking spaces in a lot north of the proposed building) for use of the tenants on-site and within the Gateway Campus. ",https://ceqanet.opr.ca.gov/2020010281/3,751 Gateway Boulevard Project,"Adena Friedman, Senior Planner","City of South San Francisco, Economic and Community Development",N/A,adena.friedman@ssf.net,315 Maple Street,,South San Francisco,CA,94080,6508778535,37°39'38.7"N 122°23'48"W,South San Francisco,San Mateo,,Gateway Boulevard and Oyster Point Boulevard,94080,7.4,"015-24-290, 015-24-360",US 101,"San Francisco Bay, Colma Creek, San Bruno Canal",San Francisco International Airp,Yes,9/22/2020,11/9/2020,"Office, Other","Redevelopment, Site Plan, Use Permit","Aesthetics, Air Quality, Biological Resources, Coastal Zone, Cultural Resources, Cumulative Effects, Drainage/Absorption, Economics/Jobs, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wildfire",,,,,,,,,,,,,,,,,