SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2019119077,"San Francisco, City and County of",City and County of San Francisco,,"301 Mission Street, Millennium Tower Modified Perimeter Pile Upgrade Project",NOD,9/13/2022,9/13/2022,"After the City and County of San Francisco adopted the Final Mitigated Negative Declaration (FMND) for the 301 Mission Street (Millennium Tower) Perimeter Pile Upgrade Project, case number 2018-016691ENV, and approved the project (“adopted project”) on July 17, 2020, the project sponsor revised the project. The 301 Mission Street Modified Perimeter Pile Upgrade Project (“modified project”) would be substantially similar in scope to the adopted project, except that the modified project would install 18 new piles including 12 piles along Fremont Street and 6 piles along Mission Street (as opposed to 52 piles under the adopted project), and that the total mat extension area would be reduced from 2,130 square feet under the adopted project to approximately 1,020 square feet under the modified project. In addition, changes to the permitted shoring and excavation permits include the following: (1) reduction in plan area of excavations on Mission and Fremont streets, based on the reduction in the number of new piles from 52 to 18, (2) change from the use of jet-grouted columns to a secant pile wall system for supporting the excavation, and (3) modification of shoring wall layout to avoid conflicts with the existing PG&E vault and power conduits at the northwest corner of the existing 301 Mission Street building.",https://ceqanet.opr.ca.gov/2019119077/5,"301 Mission Street, Millennium Tower Modified Perimeter Pile Upgrade Project",Kei Zushi,San Francisco Planning Department,Environmental Planner,kei.zushi@sfgov.org,"49 South Van Ness Avenue, Suite 1400",,San Francisco,CA,94103,6286527495,,San Francisco,San Francisco,San Francisco,,94105,,3719/020-440,,,,,,,,,,,,,,,San Francisco Planning Department,Yes,9/9/2022,No,No,Yes,,Yes,,No,,https://citypln-m-extnl.sfgov.org/SharedLinks.aspx?accesskey=a3188c491fd824c33258d48103d7a0d75f85c763883b49777f9ee362eef31049&VaultGUID=A4A7DACD-B0DC-4322-BD29-F6F07103C6E0https://citypln-m-extnl.sfgov.org/SharedLinks.aspx?accesskey=a3188c491fd824c33258d48103d7a0d75f85c763883b49777f9ee362eef31049&VaultGUID=A4A7DACD-B0DC-4322-BD29-F6F07103C6E0