SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2019119077,"San Francisco, City and County of",City and County of San Francisco,,"301 Mission Street, Millennium Tower Perimeter Pile Upgrade Project",MND,11/20/2019,,"The proposed project is associated with the 50,500-square-foot (sf) (1 .16-acre) parcel (Assessor's Block 3719, Lots 020-440) at 301 Mission Street located on the south side of Mission Street between Fremont and Beale streets within San Francisco's Financial District. The existing high-rise on the 301 Mission Street parcel is called the Millennium Tower. The project site includes portions of the public right-of-way on Fremont, Beale, and Mission streets adjacent to the 301 Mission Street parcel as well as limited portions of the 301 Mission Street parcel itself as described in more detail below. The project site and area of soils disturbance is located primarily in the public right-of-way on the block bounded by Mission Street to the north, Fremont Street to the west, Beale Street to the east, and the Transit Center to the south. See NOC for full details.",https://ceqanet.opr.ca.gov/2019119077/2,"301 Mission Street, Millennium Tower Modified Perimeter Pile Upgrade Project",Kei Zushi,San Francisco Planning Department,N/A,,"1650 Mission Street, Suite 400",,San Francisco,CA,94103-2749,4155759038,37°47'26.45"N 122°23'46.14"W,San Francisco,San Francisco,,Mission and Fremont streets,94105,0.32 Acres,Assessor's Block 3719/Lots 020-440 ,"I-80, I-280, US-101",San Francisco Bay,,No,11/20/2019,12/19/2019,Other,,"Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Sewer Capacity, Solid Waste, Transportation",,,,,,,,,,,,,,,,,