SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2019119072,"Manteca, City of",City of Manteca,,Airport Way: Yosemite Avenue to Daniels Street Widening,MND,11/20/2019,,"The Project consists of widening Airport Way from the existing two lanes to a six-lane arterial roadway from north of Yosemite Avenue to just north of Daniels Street. The ultimate six-lane configuration includes three travel lanes in each direction, a raised median, a 5-foot Class II bike lane, and a 6-foot sidewalk with curb and gutter on either side of the street. Initial phase would include two travel lanes and a Class II bike lane in each direction with a two-way turn lane. Curb, gutter, and sidewalk are proposed on the east side of the roadway only. When funding is available, the roadway would then be further widened to the ultimate six-lane facility. To maintain the existing drainage pattern and comply with stormwater quality requirements, both the four-lane phase and the ultimate six-lane facility include construction of percolation basins for on-site stormwater treatment.",https://ceqanet.opr.ca.gov/2019119072/2,Airport Way: Yosemite Avenue to Daniels Street Widening,Koosun Kim,City of Manteca,N/A,,1001 West Center Street,,Manteca,CA,95337,2094568419,37°47'38.64"N 121°15'7.9"W,Manteca,San Joaquin,,Airport Way and Daniels Street,95337,15,,SR120,,,Yes,11/20/2019,12/23/2019,Transportation,,,,,,,,,,,,,,,,,,,