SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2019110187,"Parks and Recreation, Department of",California Department of Parks and Recreation,,North Point Trail - Bridge Replacement Project,NOE,11/8/2019,11/8/2019,"Replace two (2) bridges and construct two (2) minor trail realignments in Ano Nuevo State Park to improve year round access along the North Point Trail. Work will: For Bridge #1 : • Construct a new approximately 150 ft. x 541 wide trail segment; • Excavate 30ft³ of soil to create mudsills and approaches; • Construct two (2) 12"" x 16"" x T mudsills; · • Install one (1) 30' long x 5' wide aluminum bridge; and • Construct two (2) 4 ft. long x 5' wide wood approaches at each end of the bridge. For Bridge #2: • Construct a new approximately 100 ft. x 4' wide trail segment; • Excavate 30ft³ of soil to create mudsills and approaches; • Construct two (2) 12''x16''x7' mudsills • Install one (1) 30' long x 5' wide aluminum bridge; and • Construct two (2) 4 ft. long x 5' wide wood approaches at each end of the bridge. Utilize excavated sand (from trail construction) and native mulch and debris to aid in the decommissioning of the old trail.",https://ceqanet.opr.ca.gov/2019110187/2,North Point Trail - Bridge Replacement Project,Sheila Branon,Department of Parks and Recreation,N/A,Sheila.branon@parks.ca.gov,1416 Ninth Street,P.O. Box 942896,Sacramento,CA,94296-0001,8313356385,,,San Mateo,,,,,,,,,,,,,,,,,Categorical Exemption,"Class: 2, 3 & 4 Section: 15302, 15303 & 15304","Project consists of replacement or reconstruction of existing · structures and facilities where the new structure will be located on the same site as 'the structure replaced and will have substantially the same purpose and capacity as the structure replaced; the construction and location of limited numbers of new small facilities or structures; and the minor public alteration in the condition of land which does not involve the removal of healthy, mature, scenic trees, and is included as ""signs"" and ""Trail Construction or realignment"" in the Department of Parks and Recreation's list of exempt activities, in accordance with CCR § 15300.4.",,,,,,,,,,,,