SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2019099081,Alameda Contra Costa Transit District,,AC Transit,Division 4 (D4) Modifications to Accommodate Battery Electric Buses as part of the 45 Zero Emission Bus Purchase,MND,9/25/2019,,"As part of the 45 Zero Emission Bus (ZEB) purchase, AC Transit proposes to procure between 20 and 40 Battery Electric Buses (BEBs) that would directly replace the same amount of 40-foot diesel buses to be based at the Division 4 (D4) Facility. The proposed project includes construction of associated infrastructure improvements to the D4 facility located at 1100 Seminary Avenue in Oakland. The new infrastructure improvements would include the installation of additional transformers, switchgears, charging equipment, and the construction of a new concrete deck to accommodate the new overhead charging stations. Overhead charging stations would be fixed on the underside of the overhead deck such that buses can park underneath and connect to the charging unit via pantograph or overhead reel. The proposed project would also include pavement of 110,000 square feet of the approximately 11.5 acres- AC Transit property located at 6235 Tevis Street to accommodate temporary bus parking during construction at the D4 facility. The Tevis Street site would continue to be used for storage after construction. Construction activities are scheduled to begin in January 2021 and expected to complete within 12 months, prior to delivery of the BEBs to the D4 facility.",https://ceqanet.opr.ca.gov/2019099081/2,Division 4 (D4) Modifications to Accommodate Battery Electric Buses as part of the 45 Zero Emission Bus Purchase,Mika Miyasato,Alameda-Contra Costa Transit District,N/A,,1600 Franklin Street,,Oakland,CA,94612,5108917138,37°45'36.8"N 122°12'13"W,Oakland,Alameda,,Seminary Avenue and San Leandro Street,94621,13.7 & 11.5,41-4058-1 and 41-4056-5,SR-185; 1-880,San Leandro Bay,Oakland International Airport,No,9/25/2019,10/28/2019,Transportation,Site Plan,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Public Services, Recreation, Schools/Universities, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire",,,,,,,,,,,,,,,,,