SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2019090701,"Coalinga, City of",City of Coalinga,,Phelps Ave Street Reconstruction Project,NOE,9/24/2019,9/24/2019,"Reconstruction of Phelps Avenue from Elm Avenue to Posa Chanet Boulevard. Proposed work includes pulverization of existing AC pavement, grading of base material, removal of minor concrete improvements, installation of curb and gutter, sidewalk, curb ramps, valley gutter, median islands, AC pavement, multi use trail, landscaping and irrigation. The project also includes installation of storm drain inlet, storm drain main, fire hydrants and street lighting.",https://ceqanet.opr.ca.gov/2019090701/2,Phelps Ave Street Reconstruction Project,Sean Brewer,City of Coalinga,N/A,,155 West Durian,,Coalinga,CA,93210,5599351533 ext. 143,,Coalinga,Fresno,,,,,,,,,,,,,,,,,Categorical Exemption,15302,"The proposed project includes the reconstruction of an existing arterial street and said improvements do not include an increase in capacity or use beyond its current use. The proposed project would not result in any significant effects related to biological resources, traffic, noise, air quality, or water quality, and the site would be adequately served by all required utilities and public services. The proposed construction activity is expected to occur within the existing right-of~way.",,,,,,,,,,,,