SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2019080123,State Water Resources Control Board,,,"Temporary Flow Variance for Pacific Gas & Electric Company's Pit 3, 4, and 5 Hydroelectric Project",NOE,8/5/2019,8/6/2019,"PG&E is proposing to temporarily lower the minimum instream flows below the Pit 3 dam and Pit 5 diversion dam to 75 cubic feet per second (cfs) in order to perform dive inspections of its Pit 3 dam and Pit 5 diversion dam facilities. Flows will be reduced from 280 cfs at the Pit 3 dam and 350 cfs at the Pit 5 diversion dam. Dive inspections are required as a result of flood events that occurred from February 3-21, 2017, in accordance with the Pit 3 Dam Safety Surveillance Monitoring Program and the Pit 5 standard operating procedures.",https://ceqanet.opr.ca.gov/2019080123/2,"Temporary Flow Variance for Pacific Gas & Electric Company's Pit 3, 4, and 5 Hydroelectric Project",Philip Meyer,State Water Resources Control Board Division of Water Rights,N/A,,1001 I Street/ PO Box 2000,,Sacramento,CA,95812,9160341536 ext. 9,,,Shasta,,,,,,,,,,,,,,,,,Categorical Exemption,"15301, Class 1",The Class 1 exemption applies because the Project involves minor operational alterations to an existing facility with no construction or expansion of use. Temporary reduction of instream flows at the Pit 3 dam and Pit 5 diversion dam will not have a significant adverse effect on the environment. The lower instream flows are required so divers can safely enter the water to inspect the dams. There is no reasonable possibility that the Project will have a significant effect due to unusual circumstances.,,,,,,,,,,,,