SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2019079100,"Gridley, City of",City of Gridley,,Little Avenue Force Main and Lift Station Improvements,MND,7/26/2019,,"The Proposed Project is the replacement of approximately 2,872 linear feet of 4-inch and 6-inch forced main wastewater pipeline with a 10-inch pipeline, one lift station, relocation of one control box, and the installation of a backup generator. The Project area starts at the Oregon/Little Avenue intersection travels east for 2,872 feet and terminates at the existing connection located in the City's old wastewater facility. The Project will abandon in place portions of the pipeline while removing other portions. Most of the construction will occur within the existing Little Avenue ROW, except for approximately 280 feet that will occur within the City's utility easement on private land and the section crossing under a BWD irrigation canal. The replacement of the pipeline under the irrigation canal will be completed using horizontal direction drilling",https://ceqanet.opr.ca.gov/2019079100/2,Little Avenue Force Main and Lift Station Improvements,Dave Harden,City of Gridley,N/A,,685 Kentucky Street,,Gridley,CA,95948,5308463631,39°21'20"N 41°121'56"W,Gridley,Butte,,Along Little Avenue between Oregon Street on the west and Vermont Street on the east.,95963,2.08,,99,Butte Water District irrigation canals,,Yes,7/26/2019,8/26/2019,Other,,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire",,,,,,,,,,,,,,,,,