SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2019070425,State Water Resources Control Board,,,Eastside Pipeline Looping and Pipeline Abandonment lmrovements,NOE,6/24/2019,6/24/2019,"The State Water Resources Control Board (SWRCB) is the lead agency. The SWRCB's Safe Drinking Water State Revolving 'Fund (SDWSRF) Program is providing state funds for the project. The Lake Morena's Oak Shores Mutual Water Company, Inc. proposes improvements to the existing water pipeline distribution system to resolve issues left by incomplete improvements in 2013. The project will install approximately 1,200 linear feet of 6-inch C900 PVC pipeline segments among dead-end pipelines in residential neighborhoods on Laurel, Primrose, Lilac, Cedar, and Poppy Drives, and between the tank site and the nitrate treatment facility. It will also install dry barrel fire hydrants on a portion of Poppy Drive; reconnect existing water services to LMOSMWC customers on Poppy and Lilac Drives; connect water services to three future customers on Lilac, Primrose, and Laurel Drives; and connect pipelines between existing lines on the storage tank road and Lake Morena Drive, between those on Lake Morena Drive and those at the nitrate treatment facility, and between those on Vine Drive and those at the nitrate treatment facility. The old pipeline system would be disconnected and abandoned in place in several locations. This project also includes the consolidation of four private residential parcels with private wells currently not served by the LMOSMWC water system. LMOSMWC well site properties (Wells 2, 5, and 6) are proposed as staging/laydown areas.",https://ceqanet.opr.ca.gov/2019070425/2,Eastside Pipeline Looping and Pipeline Abandonment lmrovements,Bridget Binning,State Water Resources Control Board,N/A,,"1001 I Street, 16th Floor",,Sacramento,CA,95814,9163415700,,,San Diego,,,,,,,,,,,,,,,,,Categorical Exemption,15303,"The project will not have a significant effect on the environment. The project has been determined to meet the requirements of the Categorical Exemption selected above, and does not include any of the Exceptions pursuant to California Code of Regulations, Title 14, Division 6, Chapter 3, Article 19, Section 15300.2.",,,,,,,,,,,,