SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2019070293,Energy Commission,California Energy Commission,,X-Line Fossil Fuel to Solar Plus Storage Conversion,NOE,6/17/2019,6/17/2019,"This project will install two ground-mounted solar photovoltaic arrays to provide power to two submersible irrigation pumps and to charge a 60-kilowatt hour battery. The pumps themselves will remain in place. The solar arrays will be located on two separate locations: one on the northeast side of the property and other on the east side. Each array area will occupy approximately 39 feet by 48 feet, but will not impact existing agricultural operations. The project will also include minor grading, trenching, and installation and compaction of conduit runs from the solar arrays to the existing on-site irrigation pumps. After installation, the area beneath the arrays will be covered with crushed rock for vegetation control. The project will be constructed to avoid impacts to harvesting and farming activities. The arrays will be located approximately 100 feet from of existing vines.",https://ceqanet.opr.ca.gov/2019070293/2,X-Line Fossil Fuel to Solar Plus Storage Conversion,Geoffrey Dodson,California Energy Commission,N/A,,1516 Ninth Street,,Sacramento,CA,95814,9166545171,,Paso Robles,San Luis Obispo,,1551 Exline Road,,,,,,,,,,,,,,,Categorical Exemption,"15301, 15304, 15311",See Attached NOE,,,,,,,,,,,,