SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2019069058,"Atascadero, City of",City of Atascadero,,Dove Creek Mini-Storage,MND,6/14/2019,,"The project is an 81,000+ square foot mini-storage facility on a 4.2 acre site which includes indoor storage units, an office, a workshop and a caretaker's residence in a total of 9 buildings. Paved drive aisles and four parking spaces are included. The project site is designated with 1.8 acres of wetland habitat however; recent drought conditions and annual animal grazing have denuded the habitat vegetation. The property contains an identified blue-line creek with a clearly defined flow path. Water enters the site from an existing culvert under El Camino Real and exits through existing culverts under Viejo Camino. The applicant proposes to realign the creek to accommodate the site development and adjust the flood plain designation of the site. The realigned creek would run parallel to El Camino Real into a 0.77 acre wetland restoration area and then flow in a straight path to the Viejo Camino culverts. The realigned creek channel will be constructed with a retaining wall on one side and naturalized slope on the other. The project requires California Department of Fish and Wildlife, Army Corps of Engineers, Regional Water Quality Control Board, and Federal Emergency Management Agency permits. The project will require approximately 8,000 cubic yards of cut and 12,000 cubic yards of fill material in order to create a level development area. One of the existing properties hosts a single family residence.",https://ceqanet.opr.ca.gov/2019069058/2,Dove Creek Mini-Storage,Kelly Gleason,City of Atascadero,N/A,,6500 Palma Ave,,Atascadero,CA,93422,8054703446,35°27'12"N 120°38'16"W,Atascadero,San Luis Obispo,,El Camino Real and Viejo Camino,93422,4.2,"045-342-009, 010",101,"Unnamed Creek, Paloma Creek, Salinas River",,No,6/14/2019,7/15/2019,Industrial,Use Permit,"Aesthetics, Air Quality, Biological Resources, Cultural Resources, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Hydrology/Water Quality, Land Use/Planning, Noise, Vegetation, Wetland/Riparian",,,,,,,,,,,,,,,,,