SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2019060008,Merced Union High School District,,,Merced High School Stadium Project,EIR,12/11/2019,,"Construction and operation of a high school football stadium with a seating capacity for 3,100. Grandstands will be located on the north and south sides of the stadium, connected by concrete walkways around the perimeter of the football field to an entry gate structure located at the southeast corner of the stadium and to an existing concessions/restroom building on the east side of the stadium. The project includes the construction of walking paths connecting the stadium to existing parking on the southern portion of the high school campus. The grandstands will be completed in two phases with the first 2,000 seats on the south (home) side being completed in the initial phase, and an additional 1,100 seats on the north (visitor) side, as well as conversion from natural to artificial turf being completed in the second phase.",https://ceqanet.opr.ca.gov/2019060008/3,Merced High School Stadium Project,Ted Walstrom,Merced Union High School District,N/A,,P.O. Box 2147,,Merced,CA,95344,2093252243,37°19'20.5"N 120°28'19.2"W,Merced,Merced,,Olive Avenue and G Street,95348,3,236-180-011,"99, 140, 59","Black Rascal Creek, Fahrens Creek, Bear Creek",,Yes,12/11/2019,1/24/2020,Educational,,"Aesthetics, Air Quality, Biological Resources, Cultural Resources, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Hydrology/Water Quality, Noise, Transportation",,,,,,,,,,,,,,,,,