SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2019049138,"Water Resources, Department of",California Department of Water Resources,DWR,2017 Storm Water Damage DWR Rehabilitation - Phases 4 and 5 Project,NOD,1/7/2020,1/7/2020,"The Project will repair 29 levee locations. The general construction approach for all 29 sites consists of clearing and grubbing for site preparation. Following site preparation, existing rock and levee soils disturbed during failure will be excavated and the levee slope graded to design specifications. Geotextile fabric will be placed over excavated areas and covered with rock slope protection. Clean rock will be placed into the water at the toe of the bank up to the water surface elevation at the time of construction. Once bank construction is completed, all disturbed soil on repair site remaining will be hydro-seeded with native seed mix.",https://ceqanet.opr.ca.gov/2019049138/5,2017 Storm Damage DWR Rehabilitation - Phase 4 and 5 Repair Sites,Nicholas White,Regional Water Quality Control Board,N/A,,11020 Sun Center Drive #200,,Rancho Cordova,CA,95670,9164644856,,,"Butte, Colusa, Glenn, Sacramento, San Joaquin, Sutter, Tehama, Yolo",,,,,,,,,,,,,,,,,,,,Regional Water Quality Control Board,No,1/2/2020,No,No,Yes,,Yes,Yes,No,Yes,"310 El Camino Avenue, Room 140, Sacramento, CA 95821"