SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2019049093,"Water Resources, Department of",California Department of Water Resources,DWR,Tisdale Weir Rehabilitation and Fish Passage Project,NOP,4/15/2019,,"The Califomia Department of Water Resources (DWR) Division of Flood Management proposes to construct, operate and maintain the Tisdale Weir Rehabilitation and Fish Passage Project (Proposed Project) which would integrate structural rehabilitation of the Tisdale Weir along with installation of fish passage facilities to allow upstream migrating fish (salmon and sturgeon) access to the Sacramento River. Structural rehabilitation to the Tisdale Weir would include replacing southern and northern abutment walls; removing and replacing energy dissipation basin; and injection grouting and patching the weir. Fish passage facility installation would include a reconstructing the energy dissipation basin on the downstream side of the weir to facilitate fish collection·and passage through a notch in the weir; installing a notch in the existing weir, installing operable gates (for flow regulation) in the notch, installing an equipment access pad and attendant facilities at the north end of the weir; an access ramp; and constructing a channel connecting the notch in the weir to the Sacramento River.",https://ceqanet.opr.ca.gov/2019049093/2,Tisdale Weir Rehabilitation and Fish Passage Project,Stephanie Ponce,California Department of Water Resources div. of Flood Managemen,N/A,,"3310 El Camino Avenue, Room 140",,Sacramento,CA,95821,9165742010,39°1'41.57"N 121°48'14.9"W,Yuba City,Sutter,,Garmire Road and Tisdale Road,95982,,"21-100-008, -009, -110-001, -002, -023, -280-007, -008, -290-001",,Sacramento River,,Yes,4/15/2019,5/15/2019,Water Facilities,,,,,,,,,,,,,,,,,,,