SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2019029119,Mesa Water District,,MWD,"Mesa Water District Wells No. 12, No 14, and Pipeline Project",NOD,3/23/2021,3/23/2021,"Mesa Water District is proposing to construct two new potable water wells on approximately 0.89 acre of land located in the City of Santa Ana, California. In order to provide additional local water reliability, Mesa Water District purchased two properties within the City of Santa Ana to be used as groundwater well sites. Proposed Well No. 12 and associated structures and equipment would be constructed within a 0.43-acre site. Proposed Well No. 14 and associated structures and equipment would be constructed within a 0.46-acre site. Each well site will include a well building, electrical building, Southern California Edison transformer, chemical storage area, emergency backup generator, and a well water waste air gap. Both wells are located outside of Mesa Water District’s service area and will require the construction of approximately 4,500 feet of pipeline to connect the proposed wells to Mesa Water District’s existing system. The project is a component of the larger Santa Ana River Conservation and Conjunctive Use Program (SARCCUP), a watershed-scale collaborative program designed to improve the Santa Ana River watershed’s water supply resiliency and reliability to which the Orange County Water District is a participating agency. An Environmental Impact Report (EIR) was certified by the Inland Empire Utility Agency for the SARCCUP project in 2019 (State Clearinghouse Number 2016101079) which identified the Orange County Water District as a Responsible Agency to the SARCCUP project. The Orange County Water District, as Responsible Agency, approved the SARCCUP EIR in April 2019. As a component of the implementation of the SARCCUP project, the Orange County Water District will provide grant funding for Mesa Water District’s Wells No. 12 and No. 14 and Pipeline Project. Mesa Water District certified a Mitigated Negative Declaration (State Clearinghouse Number 2019029119) for the Wells No. 12 and No. 14 and Pipeline Project in 2019, which identified the Orange County Water District as a Responsible Agency. In the Orange County Water District’s capacity as a Responsible Agency, the Orange County Water District Board of Directors approved a grant funding agreement with the Mesa Water District and approved the Mitigated Negative Declaration for the Wells No. 12 and No. 14 and Pipeline Project in March 2021. ",https://ceqanet.opr.ca.gov/2019029119/3,Wells No. 12 and No. 14 and Pipeline Project,Shawn Nevill,Principal Planner,N/A,snevill@ocwd.com,18700 Ward Street,,Fountain Valley,CA,92704,7144695740,33°42'24"N 117°55'21"W,"Costa Mesa, Santa Ana",Orange,Orange,4011 W. Chandler Avenue,92704,N/A,N/A,N/A,N/A,N/A,,,,,,,,,,,,Orange County Water District,No,3/17/2021,No,No,Yes,,Yes,Yes,No,Yes,"Orange County Water District, 18700 Ward Street, Fountain Valley, CA 92704"