SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2019012022,"Sunnyvale, City of",City of Sunnyvale,,Lawrence Station Area Plan (LSAP) Update and Intuitive Surgical (ISI) Corporate Campus Project,SBE,5/26/2021,,"The LSAP Update primarily consists of: increasing the allowable housing potential within the adopted LSAP from 2,323 to 5,935 net new units; expansion of western LSAP boundary to include parcels at 932, 950, 945, and 955 Kifer Road; adoption of the Lawrence Station Sense of Place Plan; and Modifications to General Plan and Zoning designations; LSAP Development Incentives Program; and associated General Plan, LSAP, and Zoning Code text amendments. The proposed ISI Corporate Campus Project at 932, 950, 945, 955 Kifer Road is a proposed corporate campus that would include demolition of two existing industrial/office/R&D buildings and three accessory structures; and construction of two new three-story office/R&D/manufacturing buildings totaling 1,211,000 sq. ft. (including 148,000 sq.ft. of basement space); an 11,000 sq. ft. freestanding amenity building; an overpass pedestrian bridge; and a five-level, above ground parking structure with an attached 12,000 sq. ft. central utility plant. ",https://ceqanet.opr.ca.gov/2019012022/2,Lawrence Station Area Plan (LSAP) Housing Study and Boundary Expansion,George Schroeder,Senior Planner,N/A,gschroeder@sunnyvale.ca.gov,456 West Olive Avenue,,Sunnyvale,CA,94088-3707,4087307443,,Sunnyvale,Santa Clara,,Lawrence Expressway & Kifer Rd/Reed Ave; Kifer Rd & Uraniam Dr/Commercial St.,94085,227,multiple,82,Calabazas Creek,San Jose International,Yes,5/26/2021,7/12/2021,"Office, Residential","General Plan Amendment, Master Plan, Redevelopment, Rezone","Aesthetics, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Economics/Jobs, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wetland/Riparian",,,,,,,,,,,,,,,,,