SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2018121059,Riverside Unified School District,,,Longfellow Elementary School Expansion,EIR,7/2/2019,,"Note: Extended Review Per Lead The project includes acquisition of two residential parcels: 2210 Seventh Street (APN 211-143-008) and 2226 Seventh Street (APN 211-143-007), the alley adjacent to the south side of the residential parcels, and the Seventh Street cul-de-sac north of the residential parcels. Three new buildings would be constructed: a two-story classroom building, a one-story classroom building, and a one-story Administration Building (12 new classrooms and removal of 12 portable classroom buildings), along with a 40-space parking lot, asphalt hardcourts and playground, and concrete walkways and curbs. The modernization component consists of five classroom buildings, and the multipurpose and cafeteria building, and conversion of the administration building to a parent center/classroom and day care. Work would include new paint, windows, ceilings, and flooring; lighting an",https://ceqanet.opr.ca.gov/2018121059/2,Longfellow Elementary School Expansion,Gaby Adame,Riverside Unified School District (RUSD),N/A,,3070 Washington St,,Riverside,CA,92504,9517887496,33°58'38"N 117°21'32"W,Riverside,Riverside,,3610 Eucalyptus Avenue,92507,6.9,"211-105-001; 211-143-006, -007,","SR-60, SR-91, I-215","Santa Ana River, Tequesquite Arroyo, Riverside Canal",,No,7/2/2019,8/19/2019,Educational,,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire",,,,,,,,,,,,,,,,,