SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2018121015,"San Joaquin, City of",City of San Joaquin,,San Joaquin Phase 2 Water System Improvements Project,MND,12/6/2018,,"Note: Review Per Lead The project will involve installing a new well (Well #6), a 71,000 gallon tank for backwash storage and sludge settling and associated filtration equipment, approx 2,300 lf of 10-in diameter pipeline to convey raw ground water from Well #4 to Well #6, approx 700 ft of 12-in pipeline to connect Well #6 to the existing water distribution system, and approx 400 ft of 6-in sewer pipe to connect the new well filtration system to the existing sewer system to dispose of manganese sludge. In addition, approx 1,620 ft of new 6-in water main will be installed and approx 8,200 ft of existing 6-in water main will be replaced. These infrastructure improvements will help the city reliably meet the max daily demand of 1,500 GPM and the peak hour demand of 3,339 GPM.",https://ceqanet.opr.ca.gov/2018121015,San Joaquin Phase 2 Water System Improvements Project,Lupe Estrada,City of San Joaquin,N/A,,21900 Colorado Avenue,P.O. Box 758,San Joaquin,CA,93660,5596934311,,San Joaquin,Fresno,,Citywide,93660,"~2,700 ft",public ROW and city-owned,,Various canals,,No,12/6/2018,1/7/2019,Other,,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire",,,,,,,,,,,,,,,,,