SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2018118399,"Belmont, City of",City of Belmont,,"Bank Stabilization Project at 1647 Ralston Avenue, Belmont, California",NOE,11/21/2018,11/21/2018,"Bank stabilization along Belmont Creek to protect existing, permitted structures. The project includes teh installation of stitch piers, riparian planting on the bank, and bioengineering methods to stabilize the toe of the bank. The project will protect the homeowner's property and will restore riparian habitat.",https://ceqanet.opr.ca.gov/2018118399,"Bank Stabilization Project at 1647 Ralston Avenue, Belmont, California",Rob Gill,City of Belmont,N/A,,"One Twins Pine Lane, Suite 110",,Belmont,CA,94002-3893,6505984204,,Belmont,San Mateo,,,,,,,,,,,,,,,,,Categorical Exemption,4 and 33,"The project was subject to biological, hydrologic, and geotechnical studies. It was found not to have a significant effect, and is designed to have a beneficial effect, on the creek environment while protecting existing permitted structures. It incorporates protection measures identified in the studies. It does not trigger exceptions that would prevent implementation.",,,,,,,,,,,,