SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2018118344,"Regional Water Quality Control Board, Region 9 (San Diego), San Diego","Regional Water Quality Control Board, Region 9",,Mount Carmel Pipeline Washout Repair Project,NOE,11/20/2018,11/20/2018,"A five-foot section of the Applicants petroleum pipeline is exposed due to erosion and channel incision caused by a concrete V-ditch and culvert outlet that discharges upstream of the pipeline. The Applicant proposes to recontour the channel and banks around exposed petroleum pipeline, rebury the exposed section of pipe, install concrete open cell matting over channel bottom, place rip-rap from the concrete V-ditch outlet to the upstream end of the mats, and place a rip-rap grade control structure at the downstream end of the mats. Stockpiled soils from the excavation will be used to fill the voids in between the spaces of the revetment mats and rip-rap. The bank slopes will be covered with erosion control blankets to prevent erosion and the streambed banks will be hydro seeded and revegetated with native plants.",https://ceqanet.opr.ca.gov/2018118344,Mount Carmel Pipeline Washout Repair Project,David Gibson,"Regional Water Quality Control Board, Region 9",N/A,,San Diego Region,"2375 Norhtside Drive, Suite 100",San Diego,CA,92108,6195213005,33.915617°'"N 117.218370°'"W,San Diego,San Diego,,,,,,,,,,,,,,,,,Categorical Exemption,"Class 1, sec. 15301","Inspection, repair, or maintenance of an existing facility involving negligible or no expansion of an existing use. Replacement or reconstruction of existing utility systems and facilities involving negligible or no expansion of capacity. ",,,,,,,,,,,,