SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2018108112,Fish & Wildlife 1 (Redding),"California Department of Fish and Wildlife, Region 1",CDFW,Diversion Dam Removal Project (Lake or Streambed Alteration Agreement No. 1600-2015-0257-R1),NOE,10/3/2018,10/3/2018,"The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement number 1600-2015-0257-R1, pursuant to Section 1602 of the Fish and Game Code to Mr. Daniel Davoudian. The project is limited to full removal and remediation of a dam which was installed without prior authorization. The dam was built using rebar and poured concrete and measures approximately 2.5-feet tall and spans width of the stream channel. Fine sediment and gravels are impounded behind the concrete dam, and water has eroded the right bank by going around the dam structure. To remove this dam, a temporary diversion dam will be constructed upstream to de water the work area. The dewatering will be done with sandbags, plastic sheeting, and flexible culverts to reroute water around the dam and work area. An electric demolition hammer will break the dam apart into larger pieces which can be hauled out of the stream channel and taken away using wagons or small trailers towed by ATV. Once the concrete and rebar have been removed from the channel, a shovel or other hand tools will be used to realign the gradient of the stream channel. Any large rocks shall be placed along the right bank to protect it from further scour. All equipment, including diversion sandbags, piping, plastic, broken concrete, rebar and tools shall be removed from the site at the completion of the project. This Agreement does not authorize the diversion of water out of the stream now or in the future. The intent of the project is to restore the stream channel and banks to pre-dam condition.",https://ceqanet.opr.ca.gov/2018108112,Diversion Dam Removal Project (Lake or Streambed Alteration Agreement No. 1600-2015-0257-R1),Kate Blanchard,"California Department of Fish and Wildlife, Region 1",N/A,,Northern Region,601 Locust Street,Redding,CA,96001,5302252239,40.54559°'"N 123.13520°'"W,,Trinity,,,,,,,,,,,,,,,,,Categorical Exemption,"Class 7, title 14, sect. 15307",Remediation of unpermitted stream alteration to reduce impacts to natural channel and reduce sedimentation and erosion.,,,,,,,,,,,,