SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2018102048,Sacramento Suburban Water District,,,Municipal Production Well 79 - Verner/Panorama,NOD,11/20/2018,11/20/2018,"The Sacramento Suburban Water District proposes to construct and operate one municipal supply well to supplement existing supplies in the northern portion of its service area, within Sacramento County. The Well 79 Verner/Panorama site would consists of a 18-in groundwater well capable of producing approx 1,500 gpm. The well would include new connections to both the Sacramento County-owned storm drain and sanitary sewer. An approx 700 sf building would be constructed to house the motor control center, treatment equipment, and chlorination facilities for disinfection of the treated water. The building will also be plumbed for fluoridation of water. If elevated levels of iron/manganese are detected in the water, a treatment system would be installed. If necessary, the iron/manganese treatment system would include components such as horizontal multi-media pressure filter, ground-level backwash water holding tank, associated pipes and valves, and associated electrical switchgear. The treatment system would require the construction of an above-grade backwash storage tank with capacity to store approx 60,000 gallons. This painted metal tank would be approx 25 ft in diameter and up to 20 ft tall. In addition, the well may be equipped to operate as aquifer storage and recovery well in the future. This improvement would involve the installation of a specialized valve and some small-additional station piping, all within the area already disturbed. ",https://ceqanet.opr.ca.gov/2018102048/2,Municipal Production Well 79 - Verner/Panorama,David Morrow,Sacramento Suburban Water District,N/A,,"3701 Marconi Avenue, Suite 100",,Sacramento,CA,95821-5303,9169727171,38°'"N 121°.327'"W,Citrus Heights,Sacramento,,Panorama Dr and Verner Ave,95621,2.5,229-0390-001,I-80 WB,,,,,,,,,,,,,,Sacramento Suburban Water District ,Yes,11/20/2018,No,No,Yes,,No,,No,Yes,"3701 Marconi Ave, Sacramento CA 95821"