SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2018102010,"Chico, City of",City of Chico,,Southeast Trunk Sewer Project 17-A (CIP 50366),MND,10/3/2018,,"The proposed project includes the installation of approx 4,450 lf of 27-in diameter sanitary sewer trunk line along an abandoned railroad grade from the Midway/Hegan Lane intersection northwesterly to Estes Rd. The new gravity sewer line will cross beneath Comanche Creek and connect to an existing 33-in sewer trunk line at Estes Rd. Open trench depths will range from 10-15 ft. An inverted siphon will be installed below Camanche Creek, utilizing trenchless boring techniques to avoid impacts to jurisdictional waters. Boring depths will be approx 10 ft below the creek bed. Launching and receiving pits will be excavated on either side of the creek channel to accommodate the bore equipment. The trunk line is proposed to be installed along the center of the railroad grade, where possible, to minimize impacts to existing trees. There are no permanent above ground structures associated with the project. Minor utility relocations will be necessary to accommodate the new sewer infrastructure. The project, included in the Sanitary Sewer Master Plan Update (2013), is required to service the future development anticipated in southeastern Chico, as identified in the Chico 2030 General Plan (adopted April 2011 and amended March 2017) and analyzed in the General Plan Environmental Impact Report )GPEIR) (SCH # 2008122038).",https://ceqanet.opr.ca.gov/2018102010,Southeast Trunk Sewer Project 17-A (CIP 50366),Tracy Bettencourt,City of Chico,N/A,,P.O. Box 3420,,Chico,CA,95927,5308796903,39°42'32.6"N 121°48'34.7"W,Chico,Butte,,Midway/Meyers St/Estes Rd,95928,4450 lf,"039-410-013, -060-143, -144",99,Comanche Creek,,Yes,10/3/2018,11/1/2018,Other,,"Aesthetics, Air Quality, Biological Resources, Cultural Resources, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Noise, Public Services, Recreation, Sewer Capacity, Wetland/Riparian",,,,,,,,,,,,,,,,,