SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2018092031,"Regional Water Quality Control Board, Region 6 - South Lake Tahoe","California Regional Water Quality Control Board, Lahontan South Lake Tahoe Region 6 ",RWQCB,Meeks Bay Restoration Project,JD ,6/10/2022,,"The Meeks Bay Restoration Project proposes to restore and enhance ecological conditions and provide for sustainable recreation. The project involves removal of Meeks Bay Marina; restoration of Meeks Creek and associated wetland/lagoon habitat; continued management of AIS; replacement of the SR 89 bridge; reconfiguration or construction of pedestrian and vehicle circulation, trail bridges, parking areas, cabins, and campgrounds; installation of utility infrastructure and best management practices, shoreline stabilization, habitat enhancement, and resource protection features; and other associated improvements. It also involves the potential for new recreation facilities, such as a pier or paddlecraft launch that varies by action alternative, to offset the loss of motorized boating access with the removal of the marina. Resource Protection Measures and mitigation measures are incorporated into all action alternatives to minimize potential environmental impacts from construction and operation of the project.",https://ceqanet.opr.ca.gov/2018092031/2,Meeks Bay Restoration Project,Brian Judge,Lahontan Regional Water Quality Control Board,Engineering Geologist,Brian.Judge@waterboards.ca.gov,2501 Lake Tahoe Boulevard,,South Lake Tahoe,CA,96150,5305425426,39°2'0.11"N 120°7'23"W,,El Dorado,,SR 89 and Manicina Road,96142,74,016-041-007 and 016-041-010,SR 89,Lake Tahoe and Meeks Creek,none,Yes,6/10/2022,8/9/2022,Other,,"Aesthetics, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Noise, Population/Housing, Public Services, Recreation, Transportation, Tribal Cultural Resources, Vegetation, Wetland/Riparian, Wildfire",6/10/2022,8/9/2022,,,,,,,,,,,,,,,